New Developments Archives - Te Aponga Uira
131
archive,category,category-new-developments,category-131,ajax_fade,page_not_loaded,,qode-theme-ver-10.0,wpb-js-composer js-comp-ver-4.11.2,vc_responsive

New Developments

Avatiu Valley Power Station: Switchroom 1 HV Switchgear Replacement Project Te Aponga Uira invites bids from suitably qualified companies or groups for the replacement of aged HV Switchgear in Switchroom 1 of the Avatiu Valley Power Station.  The successful Tender will be responsible for the supply and...

Power Cable Replacement from Avana bridge to Titikaveka substation - CK171811 Te Aponga Uira invites bids from suitably qualified companies or groups to undertake trench excavation and cable installation from Avana bridge to Titikaveka substation on Rarotonga, a total distance of 4,813m. The Request for Tender documents...

Careful steps are being taken to optimise existing power system assets as well as new investments in generation, storage, grid stability and customer control assets.   In November 2016 TAU will release its Stage 2:  Rarotonga Renewable Energy Implementation Plan by 2020 and Beyond outlining its Investment...